PIPE - LINE Construction

 

Year

Project

Client

Designation

Quantity

2001

 In Salah Gaz Project

BECHTEL

 Transport tube 48" pipeline

 130 km(80.776 miles)

2005

 Realization of compressor station

Grouping MIDI

 Realization of compressor gas station 42 " GK2 de 60%

 62km(38.525miles)

2006

 Pipe line  Ø8"

SONELGAZ

 Realization of pipe line Ø 8"OULED MIMOUNE (TLEMCEN) 2 LOTS

 15+15=30 Km(18.641miles)

2006

 Pipe line Ø 8"

SONELGAZ

 Realization of pipe line Ø 8"SIDI ALI – MOSTAGANEM 2 LOTS

 13+13=26Km(16.156miles)

2006

 Pipe line Ø 8"

SONELGAZ

 Realization of pipe line Ø 8" ASSLA- NAAMA.

 22 Km(13.670miles)

2007

 Pipe line Ø 8"

SONELGAZ

 Realization of pipe line Ø 8"BOUHAROUNE ALGER

 07 km(4.350miles)

2007

 Pipe line Ø 12"

SONATRACH

 Realization of pipe line Ø 12" DP HASSI .Berkaoui OUARGLA

 36 Km(22.369miles)

2007

 Pipe line Ø 12"

SONELGAZ

 Realization of pipe line Ø 12" TKOUT – BATNA-

 22 Km(13.670miles)

2008

 Pipe line 28"

SONELGAZ

 Realization of pipe line Ø 28".

 85km(52.817miles)

2013

 Pipe line Ø 8"

CEEG

 Realization of pipe line Ø 8   DP HARRAZA - W.BBA

 20KM(12.4274miles)

2013

 Pipe line Ø 8"

 CEEG

 Realization of pipe line Ø 8  DP BENDAOUED - W.BBA

 2KM(1.24274miles)

2013

 Pipe line Ø 8"

 CEEG

 Realization of pipe line Ø 8   DP BOUMALEK - W.MILA

 5KM(3.10686miles)

2013

 Pipe line Ø 8"

  CEEG  

 Realization of pipe line Ø 8   DP GHBALA - W.JIJEL

 7KM(4.3496miles)

2014

 Pipe line 28"

CEEG

 Realization of pipe line Ø 28"   AIN OUSSARA - W.DJELFA

 30KM(18.6411miles)

2016

 Pipe line 28"

CEEG

 Realization of pipe line Ø 28" DIDOUCHE MORAD.BELLARA - W.JIJEL

 60KM(37.2823miles)