Engineering

 

Year

Project

Client

Designation

Quantity

1994

 GME48"

BECHTEL

 Surveying work and full support teams by fly-camps (Survey-As built - Tally- Profile)

F

1994

 GME 48"

BECHTEL

 Engineering works (Drafting & Design)

F

1995

 GR2 48"

BECHTEL

  Surveying work and full support of teams by fly-camps (Survey-As built - Tally- Profile)

F

1995

 GR2 48"

BECHTEL

 Engineering works (Drafting & Design)

F

1997

 GR1 -GR2 48"

BECHTEL

 Implementation & picket pumping stations

05 Stations

2002

 In Salah Gaz Project 48"

BECHTEL

 Installing of cathode protection and drilling anodes

12 wells

2004

 In Amenas Gaz Project Temporary effluent pipelineØ 16"

JGC KBR Kellog Brown.  and Root

  Surveying Works and full support of teams by fly-camps (Survey-As built - Tally- Profile)

28 km

(17.398miles)

2004

In Amenas Gaz Project Temporary effluent pipeline Ø 20"

JGC KBR Kellog Brown and Root

  Engineering Works (Drafting & Design)

28 km

(17.398miles)

2005

 Project Gazoduc Ø8" et  Ø 28"

MAZA

  COMPLETE ENGINEERING

200 Km

(124.274miles)

2006

 Projets de DP-Ouled Mimoune et DP Sidi Ali

SONELGAZ

  Engineering works (Drafting & Design) and Surveying works    (complete study).

55 Km

(34.175miles)

2008

 Reinforcement of Algiers

SONELGAZ

  Engineering works (Drafting & Design) and Surveying works      (complete study).

85 Km

(52.817miles)

2015

 Project of Realization of the Solar Panels

  SONATRACH / Rosetti Marino & FORES

 Design and engineering of solar panels

 60KM(37.2823miles)

2017

 Project of Realization of the Optical fiber

 SONATRACH / Rosetti Marino & FORES

 Design and engineering of solar Optical fiber

 40KM(24.8548miles)