year

Project

Client

Designation

Quantity

2001

 In Salah Gaz Project

BECHTEL

Civil Engineering, assistance opening track (sand dunes)

 120 km

(74.565miles)

2002

 DP. AMECHTRASS

SONELGAZ

  Works of civil Engineering station sectioning.

 01 S S

2003

 OZ2(SP5-SP6) 34"

STROYTRANSGAZ

  Civil Engineering works of two pumping stations

 02 SP

2004

 In Amenas Gas Project Temporary effluent pipeline Ø 16".

JGC KBR Kellog Brown and Root

Realization of all structures with the commissioning of Pipeline: civil engineering+ mechanical work of water 

 08 km

(4.971miles)

2004

 In Amenas Gas Project GRE-8"

JGC KBR Kellog Brown and Root

  Realization of all structures with the commissioning of Pipeline

 16km

(9.942miles)

2004

 In Amenas Gaz Project

JGC KBR Kellog Brown and Root

  Realization of laying Electrical cables 11000 KVA, 6000 KVA

 16km

(9.942miles)

2004

 In Amenas Gaz Project

JGC KBR Kellog Brown and Root

 Realization and maintenance of track, 12 M of width

 145 km

(90.099miles)

2004

 In Amenas- Gaz Project

JGC KBR Kellog Brown and Root

 Stations sitting in and preparing (lift station) Ø 32”.

 03 Stations

2008

 Reinforcement of Algiers

SONELGAZ

 Realization of two big stations (TIPAZA et ALGER)-Terminal/Arrival

 02 S(T/A)