Human and material resources to mobilize for a project

 

-         Human resources 

Qualifications

Number

 Project Manager

06

 Construction Manager

08

 Administration Manager

12

 Supervisor

29

 Foreman

30

 Machine Operators

80

Certified welders

45

 Specialized workers - Encaser - Sanders

325

 Drivers

328

 Engineers 

19

 Controllers 

06

 Administration

75

Labourer

150

 

 Graphic representation staff mobilization site

 

 

-         Material resources

Designation

Quantity

Bull Dozer

50

Sid-Boom

32

Steam shovel (tracked vehicle)

18

Loader machine 3 M3 (inflatable)

19

Grader

16

Rock breaker

16

Post weld

150

Sandblaster

15

Bender

08

Tank trailer truck

08

Trailer truck (more than 20-Ton)

15

Tipper truck

15

Flatbed truck

10

Four wheel drive vehicles

289

Tank Truck (water)

10

Tank Truck (GAS-OIL)

06

Basic life site - full Accommodation / Catering / Adm

1000

Farm Tractors

20

Filling pump

10

 Test pump

08